1 |
项目基本情况
Project description and proposed activities |
该项目的目标是利用现有热电厂的抽汽冷凝热电联产机组为主热源,新建配套的区域供热管网,为该项目区域内的民用、公用及商用建筑物提供冬季供热,替代现有的分散式低效燃煤小锅炉房,以提高热力供应的能源利用效率、治理采暖季城区煤烟型大气环境污染、减少产热煤耗并降低CO2的排放量。
The objective is to utilize extraction condensing power units in the existing coal-fired power plant for cogeneration, matching new district heating pipe network to supply winter heat to residential and commercial consumers, and replace existing small scattered inefficient coal-fired boiler rooms to improve the energy efficiency, control the urban air pollution in heating seasons, reduce the coal consumption and mitigate the CO2 emissions. |
|
|
2 |
项目减排原理
The emission reduction technology to be employed |
采用热电联产集中供热技术,替代以低效燃煤小锅炉为热源的分散式小区热网。
Utilizing cogeneration district heating technology to replace the scattered heating network composed of small inefficient coal-fired boiler rooms. |
|
|
3 |
预计年度减排量
The estimated yearly GHGs emission reductions |
吨CO2e每年
300,000(tonnes CO2e/yr) |
|
|
4 |
项目进展(环评、可研、发改委出具批准函、PDD开发等)
Project progress (Environmental impact assessment \Feasibility study Report\the Official Reply to the EIA and FSR\PDD written etc) |
该项目处于建设阶段,正在制作PDD文件。准备于2009年7月申请东道国批准函。
Construction phase, preparation for the PDD.
Preparing to apply for the Letter of Approval from the Host Country in July 2009. |
|
|
5 |
项目开始日期
The starting date of the project |
|
(项目开始日期定义为项目真实动工日期或签订主要设备、建设、运营服务等购买合同的日期)
(The starting date of the project is defined as the date when real action occurs or the date on which contracts have been signed for equipment or construction/operation services required for the project) |
|
6 |
项目预期投运时间
Expected date of full operation |
2009年10月
October 2009. |
|
|
7 |
项目预计首次交付CERs时间
Expected first year of CERs delivery |
2010年
2010 |
|