本项目装机为3MW的水电项目,地点位于四川省境内,年发电量17,091 MWh,发电量接入华南电网。
The proposed Hydro Power Project is located in Sichuan Province P.R.China. The total capacity is 8MW. The annual output is estimated to be 17,091MWh The project will connect to the South China Power Grid. |
|
|
2 |
项目减排原理
The emission reduction technology to be employed |
本项目实施后,将通过替代华南电网中部分火电厂的发电量,从而获得温室气体减排效果。