项目基本情况
Project description and proposed activities |
本项目装机为20MW的垃圾焚烧发电项目,地点位于无锡境内,年发电量2.6亿度,发电量接入华东电网。
The proposed Waste Incineration for Power Generation Project is located in Wuxi City P.R.China. The total capacity is 20MW. The annual output is estimated to be 260,000MWh The project will connect to the East China Power Grid. |
|
|
2 |
项目减排原理
The emission reduction technology to be employed |
本项目实施后,将通过替代华东电网中部分火电厂的发电量,从而获得温室气体减排效果。
The electricity generated by the project will displace part of the electricity generated by East China Grid dominated by thermal power plants. |
|